Metal Building for Ranchester, Wyoming Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Components/AccessoriesWhich base trim option should I choose? - The base trim that you choose for your steel building will depend on your building's needs and the type of foundation you use. Although we strongly recommend a notched base, we do offer several additional base trim options to suit your specific needs. Please see base conditions for more helpful information and illustrations. What type of windows do you offer? - We offer a selection of windows for your building. To learn more about what's available please visit the accessories section of our website. What comes with the doors and windows? - All of our doors and windows come with the required hardware to install them into your steel building. We provide the framing, trim, and flashing for a proper installation. How do I know where to place my windows and doors? - Windows and walk doors are generally "field located." You, as the customer, will pick the location, cut the corresponding panel to size and proceed to mount the doors and windows. If you choose to include a large number of windows or doors we may ask you to give us your proposed location to ensure proper building bracing. How do I attach my doors and windows? - All of our walk doors are self-framing, so they include the necessary items to mount them on your building. Our windows are secured by screwing the window trim directly into the building. This is also known as self-flashing. If you live in a high wind area, please talk to one of our design consultants about additional door and window mounting options. What is the R-Value of your insulation? - The r-value of our insulation depends on the thickness you choose. It will vary between R-10 and R-19. Please see the r-value section of our website for more helpful information. Ceiling & Wall Liners29g low rib panel applied to the interior of the building providing a clean protective covering over insulation or girt/purlin cavity. Mini Storage BuildingsIf you have thought of being a small business owner you might consider the self-storage market. Self-storage and mini storage buildings are a fairly inexpensive way to start a business that is designed to bring in dependable monthly revenue. Many storage facilities currently have waiting lists due to the ever-growing need for space. Mini storage buildings can be designed to include any number of individual units, depending on the site constraints. Steel frame mini storage buildings can be designed with a variety of options. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Ranchester, Wyoming. We provide the best service and prices when shopping for metal buildings or steel buildings. |