Metal Building for Stockholm, Wisconsin Build and Buy Online!
Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Storage BuildingsIt almost appears that almost every, home and garage is bursting at the seams. Surplus or unneeded equipment, furniture or other belongings clutter closets, attics and garages. But, the option of monthly storage fees does seem like a hefty price to pay just to hold on to the things you have. Self-storage buildings are an easy way to put your money in someone else's pocket. Holiday decorations, childhood keepsakes and files all need to be retained for different reasons, but the cost of storage is a burden. Owning your own storage buildings is one way to lessen the expense of personal storage with a one-time quality investment. The exciting thing about steel frame storage buildings is that you only buy them once. Mini storage is not as friendly you pay and pay, but you never own anything but the contents you placed in them. You may think that you don't need something as permanent as owning a personal storage building. But think about it - when are you going to let go of the things you have decided to save?
Pre Engineered Metal BuildingA pre engineered metal building is the obvious choice for a church or other type of meeting place. You may have noticed these structures since they are quickly becoming the "standard" in constructions methods. When you are looking for a cost effective way to meet your building needs, you should certainly think about a steel building. A pre-engineered metal building takes the risk out of putting yourself and your organization into debt. It is easy to identify the advantages in a pre-engineered metal building. You could delay development for years while you line up funding, but why? Some choose to rent space from other property owners in lieu of the responsibility of new construction. The problem with this situation is you only have access to your meeting place around someone else's schedule. After taking into account and dismissing these ideas, take some time to think about talking to a steel metal building manufacturer. As property and construction capital become harder to obtain, new solutions become ever more imperative. A pre-engineered metal building may perhaps not be part of the dream you have held for your club, association or church, however that shouldn't stop you. Some of the greatest things come in unlikely packages and we sometimes miss out when we disregard them too quickly. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Stockholm, Wisconsin. We provide the best service and prices when shopping for metal buildings or steel buildings. |