Metal Building for Mindoro, Wisconsin Build and Buy Online!
Advantages of Metal BuildingsLOW COST - Our steel buildings are more economical than conventional methods due to the originating costs and reduced labor. Complete steel buildings are delivered to the jobsite and quickly erected. QUICK CONSTRUCTION - On average, a steel building system can be completed in approximately two-thirds the time required for conventional construction. BETTER APPEARANCE - The appearance of steel buildings can easily be enhanced with stucco, stone, brick or glass. Metal building systems can attain a remarkable exterior that will merge with the ambiance of the building's surroundings. LOW ENERGY CONSUMPTION - A suitably insulated metal building can drastically decrease heating and cooling expenses. Insulated roof and wall systems preserve and reassure thermal efficiencies. LOW MAINTENANCE - Extended life materials reduce maintenance, and eliminate troubles such as structural deterioration, rotting and insect damage. EXPANDIBILTY - It is easy to enlarge a building by removing the end walls, erecting new framework and adding matching wall and roof panels. In most situations, the original end wall panels can be reused. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Steel Frame ConstructionYou can feel confident about building with steel. It is not vulnerable to the elements to the same degree that other building materials are. There are a few reasons why steel frame construction stands out more than other building materials. Wood has always been a standby, but its susceptibility to weather and aging make it less than ideal. Steel frame construction is very sound should there be a detrimental natural occurrence such as an earthquake or severe storm. You steel building should be manufactured to meet all local and applicable codes. Steel frame construction is a serious way to address the risk posed to you and your belongings should a weather emergency arise. Reputable steel building manufacturers only ship pre-engineered steel building systems when standards and codes are met. It is hard to look past the options and design flexibility that you get with metal and steel buildings. It is not just quality materials that are impressive, but the many accents that can turn a metal building into a beautiful landmark. If you are suffering from lack of space or simply looking for any kind of expansion, check out the range of high quality steel buildings that just might solve your dilemma. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Thank you for visiting Metal Building for Mindoro, Wisconsin. We provide the best service and prices when shopping for metal buildings or steel buildings. |