Metal Building for Premier, West Virginia Build and Buy Online!
Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Advantages of Metal BuildingsLOW COST - Our steel buildings are more economical than conventional methods due to the originating costs and reduced labor. Complete steel buildings are delivered to the jobsite and quickly erected. QUICK CONSTRUCTION - On average, a steel building system can be completed in approximately two-thirds the time required for conventional construction. BETTER APPEARANCE - The appearance of steel buildings can easily be enhanced with stucco, stone, brick or glass. Metal building systems can attain a remarkable exterior that will merge with the ambiance of the building's surroundings. LOW ENERGY CONSUMPTION - A suitably insulated metal building can drastically decrease heating and cooling expenses. Insulated roof and wall systems preserve and reassure thermal efficiencies. LOW MAINTENANCE - Extended life materials reduce maintenance, and eliminate troubles such as structural deterioration, rotting and insect damage. EXPANDIBILTY - It is easy to enlarge a building by removing the end walls, erecting new framework and adding matching wall and roof panels. In most situations, the original end wall panels can be reused. Thank you for visiting Metal Building for Premier, West Virginia. We provide the best service and prices when shopping for metal buildings or steel buildings. |