Metal Building for Glen Rogers, West Virginia Build and Buy Online!
Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Steel Buildings vs. Conventional ConstructionA great advantage of pre-engineered buildings is that they can be relocated if required. Since your building is shipped to you with a complete set of instructions, detailed engineering drawings and a shipping list, you can erect you steel building without consulting a construction company. This also means that should you someday decide to relocate, you can take down your building and erect it elsewhere. Adding partition walls in a steel building allows one building to be a meeting room, or office and storage facility and another to be a restaurant. Building with steel gives you the ultimate in design flexibility. You can either own one outright or purchase a steel building to rent to others. Your one time cost is regained sooner rather than later when you rent it as mini storage or public meeting space. Steel buildings can be designed with a almost unlimited amount of options. If you have a need for a new building, don't make a decision until you have explored your options with a qualified steel building manufacturer. The Steel Building Network has reviewed a wide range of manufacturers, suppliers and building industry professionals, and we know that no matter what your intended use, there is steel building system to suit your needs. Getting I contact with the right company to get your questions answered is the first step in having your building needs met. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Thank you for visiting Metal Building for Glen Rogers, West Virginia. We provide the best service and prices when shopping for metal buildings or steel buildings. |