Metal Building for Friendly, West Virginia Build and Buy Online!
Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. Panel ProfilesRoof Panel Profiles - Our standard roof sheeting is the "PBR" panel, which is available in bare Galvalume Plus® as well as a variety of colors. Wall sheeting is available in "R" and "PBR" panel. Depending on the color and your geographic location - PBR panels may not be available for certain colors. Liner Panels - For liner panels we offer a low-rib 29-gauge panel. Liner panels are an interior covering for the walls of a steel building. Like exterior walls, liner panel consists of 3-foot wide panels that are attached to the framing in the same manner as exterior sheeting. Full-height liners run from floor to roof. Partial-height liners typically attach to the girt at 7'4" and extend a few inches above it. Buildings with liner panels must have a base connection for the bottom of the panel (see base conditions). Advantages - Liner Panels enhance appearance, providing a finished look for the interior. The biggest advantage is that liners protect the insulation and the outside walls. Because un-reinforced insulation facings tear easily, and even the best-reinforced materials can be damaged, liner panels are the intelligent solution to protect your investment. Although 26-gauge exterior walls can withstand a lot of punishment, a steel liner will protect your building's interior and performs at a lower cost than other wall coverings, which will require their own framing. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Thank you for visiting Metal Building for Friendly, West Virginia. We provide the best service and prices when shopping for metal buildings or steel buildings. |