Metal Building for Cleveland, West Virginia Build and Buy Online!
Metal FrameWhat is a stronger material than metal? Metal frame buildings are nearly indestructible. You can certainly feel safe in even the worst weather in a metal frame structure. Erecting a metal frame pre engineered building might sound like a difficult project, but despite this perception, it is really not the case. Metal frame structures are cut to precise measurements and a complete set of building plans will aid in the assembly process. If you need help constructing your metal building, you will incur additional expenses, so be sure to factor construction cost into your budget when purchasing a steel building. Other Metal Building DetailsFasteners: Self-drilling fasteners are designed for rapid drilling without slipping of the drill point, thus reducing walking and surface marring. The neoprene washer keeps your building watertight as well as providing vibration dampening. Structural Bolts: We provide all the nuts and bolts to assemble your building through pre-punched holes. Closure Strips: Our Steel Buildings come with closure strips which when installed provide weather tightness. The closure strips are pre-formed to match the profile of the panels. Ridge Cap: The ridge cap is designed to match the slope and contour of the roof providing a tight seal along the ridge of the building. Trim, Flashing, Gutters & Downspouts: All our buildings come with standard trim to give the building a finished clean look. Optional Gutters and Downspouts provide additional protection from the elements. Plans and Drawings: We provide a full set of anchor bolt plans for the placement of anchor bolts in the foundation. We also provide engineered stamped and certified construction prints. In addition we provide an in depth erection manual to walk you through the erection of your building. Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Overall Heat Transmission Coefficient (U-Value) A unit used to express heat passage through a complete building section, including air films. U-Values serve as a basis for determining transmitted heat loss. The lower the U-Value, the higher the insulation value. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Thank you for visiting Metal Building for Cleveland, West Virginia. We provide the best service and prices when shopping for metal buildings or steel buildings. |