Metal Building for Susan, Virginia Build and Buy Online!
Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. FacingsIn addition to acting as a decorative protection barrier, facings serve an integral part of the overall insulation system. Facings provide vapor barriers, light reflectivity and structural strength. In some cases, a reinforcement of fiberglass scrim is used for extra rigidity and greater impact resistance. The effectiveness of a vapor barrier depends on three primary factors: 1) Location within the insulated section 2) Permeance 3) Proper installation Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Thank you for visiting Metal Building for Susan, Virginia. We provide the best service and prices when shopping for metal buildings or steel buildings. |