Metal Building for Mount Carmel, Utah Build and Buy Online!
Steel Frame ConstructionYou can feel confident about building with steel. It is not vulnerable to the elements to the same degree that other building materials are. There are a few reasons why steel frame construction stands out more than other building materials. Wood has always been a standby, but its susceptibility to weather and aging make it less than ideal. Steel frame construction is very sound should there be a detrimental natural occurrence such as an earthquake or severe storm. You steel building should be manufactured to meet all local and applicable codes. Steel frame construction is a serious way to address the risk posed to you and your belongings should a weather emergency arise. Reputable steel building manufacturers only ship pre-engineered steel building systems when standards and codes are met. It is hard to look past the options and design flexibility that you get with metal and steel buildings. It is not just quality materials that are impressive, but the many accents that can turn a metal building into a beautiful landmark. If you are suffering from lack of space or simply looking for any kind of expansion, check out the range of high quality steel buildings that just might solve your dilemma. COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Metal Buildings for RetailEvery retailer knows the importance of the manner in which merchandise is housed and displayed. In the highly competitive arena of retail sales, appearance can make a tremendous impact on attracting customers and influencing purchasing decisions. Your retail facility can be enhanced with decorative brick, wood, stucco, glass, aggregate panels, landscaping and signage. A Metal Building Depot Acceptance Corporation dealer can help you with efficient designs and a more delightful appearance, yet stay within your budget. Strip malls throughout the nation are being built with steel, utilizing the ability to add on or incorporate other fascia items - representing savings of up to 30% over other conventional construction methods. Owners and developers have come to realize that the pace at which a steel building system can be designed, manufactured, delivered and completed, is measurably less than that of any type of conventional construction. The short completion time and overall durability of steel building systems assure a more efficient turnkey project, as well as a quick return on the initial investment. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Thank you for visiting Metal Building for Mount Carmel, Utah. We provide the best service and prices when shopping for metal buildings or steel buildings. |