Metal Building for Cache Junction, Utah Build and Buy Online!
Other Metal Building DetailsFasteners: Self-drilling fasteners are designed for rapid drilling without slipping of the drill point, thus reducing walking and surface marring. The neoprene washer keeps your building watertight as well as providing vibration dampening. Structural Bolts: We provide all the nuts and bolts to assemble your building through pre-punched holes. Closure Strips: Our Steel Buildings come with closure strips which when installed provide weather tightness. The closure strips are pre-formed to match the profile of the panels. Ridge Cap: The ridge cap is designed to match the slope and contour of the roof providing a tight seal along the ridge of the building. Trim, Flashing, Gutters & Downspouts: All our buildings come with standard trim to give the building a finished clean look. Optional Gutters and Downspouts provide additional protection from the elements. Plans and Drawings: We provide a full set of anchor bolt plans for the placement of anchor bolts in the foundation. We also provide engineered stamped and certified construction prints. In addition we provide an in depth erection manual to walk you through the erection of your building. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. General GuidelinesWhen you decide to buy a Building - Confirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Thank you for visiting Metal Building for Cache Junction, Utah. We provide the best service and prices when shopping for metal buildings or steel buildings. |