Metal Building for Melissa, Texas Build and Buy Online!
Insulating Against Radiant Heat Traditional forms of mass insulation, like fiberglass, are effective in preventing heat transfer by conduction and convection, but they less effect on radiant heat. Between 80 and 90% of the radiant heat striking fiberglass will pass through or be "emitted". Radiant transfer typically has as much impact on the temperature in a building as conduction and convection. For more information on radiant barrier facings click here. Metal BuildingsMaybe you have already purchased a small backyard storage unit. If so, you have more than likely discovered that it offers inadequate space. A custom designed metal building can still easily fit in your backyard and provide you with the space you need. Steel buildings can be designed to your specifications; these buildings are complement to your home. Youngsters appreciate the extra space to play, practice, or hang out with their friends. If you are in need of extra space but can't afford pricey construction work, a pre-engineered metal building is the way to go. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Steel Storage BuildingsSome people might not fully appreciate their need for a steel storage building. Think about all the prized possessions, and family heirlooms you are storing in the garage or attic - or even worse - paying high storage fees. There is a far more economical way to store all of your possessions. Whether you are looking to build a storage building for commercial or business use or a simple steel storage building for personal use - you cannot make a wiser choice than with a steel building system. The sturdy metal frame system makes steel storage buildings structurally superior. Pre-engineered steel buildings offer reliable protection to your investments. As with all products, not every manufacturer utilizes high quality materials. Look for a company that explains its materials and its use. Be sure to ask questions about steel storage buildings before you buy, any manufacturer will be happy to address any concerns. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thank you for visiting Metal Building for Melissa, Texas. We provide the best service and prices when shopping for metal buildings or steel buildings. |