Metal Building for Gatesville, Texas Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Pre Engineered Metal BuildingA pre engineered metal building is the obvious choice for a church or other type of meeting place. You may have noticed these structures since they are quickly becoming the "standard" in constructions methods. When you are looking for a cost effective way to meet your building needs, you should certainly think about a steel building. A pre-engineered metal building takes the risk out of putting yourself and your organization into debt. It is easy to identify the advantages in a pre-engineered metal building. You could delay development for years while you line up funding, but why? Some choose to rent space from other property owners in lieu of the responsibility of new construction. The problem with this situation is you only have access to your meeting place around someone else's schedule. After taking into account and dismissing these ideas, take some time to think about talking to a steel metal building manufacturer. As property and construction capital become harder to obtain, new solutions become ever more imperative. A pre-engineered metal building may perhaps not be part of the dream you have held for your club, association or church, however that shouldn't stop you. Some of the greatest things come in unlikely packages and we sometimes miss out when we disregard them too quickly. Thank you for visiting Metal Building for Gatesville, Texas. We provide the best service and prices when shopping for metal buildings or steel buildings. |