Metal Building for Estelline, Texas Build and Buy Online!
Facing TypesPopular Facings include: WMP-VR-R,WMP-VR,WMP-VR-BLACK,WMP-10,WMP-10-BLACK,WMP-50 Specialty Facings include: WCF-50,WCF-30,WMP-30,Arenasheild,Gymguard,R-3035-HD,WMP-F,VRP-HD,VSF-HD COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Estelline, Texas. We provide the best service and prices when shopping for metal buildings or steel buildings. |