Metal Building for Selmer, Tennessee Build and Buy Online!
Metal Building KitPurchasing your new metal building kit. You should be cautious when buying a metal building kit. Not every manufacturer uses high quality materials or fabricates to the latest industry standards. You don't want to purchase a building from a manufacturer (or broker) whose building parts were produced in a factory without the benefit of a skilled eye to oversee the process. A pre-engineered metal building should come with a complete and comprehensive set of blueprints. When a qualified steel building manufacturer puts its seal of approval on your building design you can rest assured of its structural integrity. You can expect detailed documentation about the building's fabrication and its specific code requirements as well. Before you purchase a metal building kit you should attempt to create a basic plan for its end use and design. Working with a professional steel building company should ensure that all facets of your building are taken into consideration. They can explain the building options and codes in detail so you have the accurate building specifications. Misleading Information - Deceptive PracticesThe standards and values of our industry are regularly masked by the deceptive practices of the unprincipled few. These companies deliberately mislead people hoping to increase their chances of a sale. At Metal Building Depot we know that the more you understand about the product you are buying, the more confidant you will be at purchase time. Arm yourself with information - No manufacturer keeps an inventory of buildings "ready to ship." Without exception, steel buildings are made specifically to order. A building should be designed to meet your needs and more importantly - your building code. Some companies create "general" price lists for common sizes, but the selection is very limited to a geographic area with limited variance in design. Beware of companies implying they keep an existing inventory of buildings. To find out whether a "clearance" or "cancelled order" really exists inquire on the earliest ship date. You should be able to take immediate delivery on a building "ready to ship." There is no such thing as making simple structural changes on a pre-designed building. Moving or adding a door opening on an existing or "ready to ship" building - could require the use of a wind column or portal frame. This could change the rigid frame design and render the existing design useless. Additionally, changing the wind or snow load could require the girt and purlin spacing to change and the location of connection plates along columns and rafters may not be located properly. The bottom line is that a structural change most likely requires a new building design. The moral of this story is: If a seller claims to have a building "ready to ship" make sure it will meet or exceed you local building codes and loads and more importantly - your needs. Proposal or Propose "ALL" - We want to help you eliminate the "gray areas" in a typical building quote. The items listed on your contract should be made clear as to exactly what is being promised. Our itemized contracts are detailed and specific and you'll never see "included" in one price (without a description). All your accessories and options are listed as separate line items. With our online quote you will always know exactly what you're paying for. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Thank you for visiting Metal Building for Selmer, Tennessee. We provide the best service and prices when shopping for metal buildings or steel buildings. |