Metal Building for Bumpus Mills, Tennessee Build and Buy Online!
Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. Constructing a Large Steel BuildingHave you considered all of your steel building options? There are many types of standard buildings to choose from, but they are not the only option. Buildings can be finished with a multitude of options and accessories. Your land and location will control some of the parameters of the kind of structure you need. Aside from these factors you can make the choices based on your preferences. Windows, skylights and panel styles can be individually selected to comprise a personal metal building kit. Pre-engineered metal building plans are just the starting point from which you can select options and accessories. Configuring your building may sound like a small deal, but it determines the type building you will purchase. Not every large steel building is intended to be a large shop. When you work with the manufacturer you can customize a structure with a polished look and feel. Regard your steel metal building as a low cost alternative to traditional construction. Pre Engineered Metal BuildingA pre engineered metal building is the obvious choice for a church or other type of meeting place. You may have noticed these structures since they are quickly becoming the "standard" in constructions methods. When you are looking for a cost effective way to meet your building needs, you should certainly think about a steel building. A pre-engineered metal building takes the risk out of putting yourself and your organization into debt. It is easy to identify the advantages in a pre-engineered metal building. You could delay development for years while you line up funding, but why? Some choose to rent space from other property owners in lieu of the responsibility of new construction. The problem with this situation is you only have access to your meeting place around someone else's schedule. After taking into account and dismissing these ideas, take some time to think about talking to a steel metal building manufacturer. As property and construction capital become harder to obtain, new solutions become ever more imperative. A pre-engineered metal building may perhaps not be part of the dream you have held for your club, association or church, however that shouldn't stop you. Some of the greatest things come in unlikely packages and we sometimes miss out when we disregard them too quickly. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Thank you for visiting Metal Building for Bumpus Mills, Tennessee. We provide the best service and prices when shopping for metal buildings or steel buildings. |