Metal Building for Mayesville, South Carolina Build and Buy Online!
Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Metal Building KitPurchasing your new metal building kit. You should be cautious when buying a metal building kit. Not every manufacturer uses high quality materials or fabricates to the latest industry standards. You don't want to purchase a building from a manufacturer (or broker) whose building parts were produced in a factory without the benefit of a skilled eye to oversee the process. A pre-engineered metal building should come with a complete and comprehensive set of blueprints. When a qualified steel building manufacturer puts its seal of approval on your building design you can rest assured of its structural integrity. You can expect detailed documentation about the building's fabrication and its specific code requirements as well. Before you purchase a metal building kit you should attempt to create a basic plan for its end use and design. Working with a professional steel building company should ensure that all facets of your building are taken into consideration. They can explain the building options and codes in detail so you have the accurate building specifications. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Concealed CondensationConcealed condensation is the most difficult to deal with and can be the most damaging to any kind of structure. This type of condensation may be controlled in metal buildings by the proper ventilation. Additional condensation control can be accomplished by venting the cold cavities of the walls and roof. Thank you for visiting Metal Building for Mayesville, South Carolina. We provide the best service and prices when shopping for metal buildings or steel buildings. |