Metal Building for Somerset, Pennsylvania Build and Buy Online!
Thermal Conductance (C-Value)A measure of the amount of heat that passes through materials of any thickness. Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. INDUSTRIALAs a company rooted in American heavy industry, We understand and appreciate the importance of strength, dependability and economy in industrial structures. Our Dealers work closely with industrial building users to meet stringent construction schedules, assist with designs for machinery and inventory layouts, and assure the design and the manufacture of strong, stable, low-maintenance structures which enhance the image of their users. Our own in-house team of experienced engineers can also help design crane buildings with a unique combination of strengths and hook clearances to fit individual, industrial requirements and criteria. Clear spans of up to 150 feet wide and heights of up to 60 feet are available, while multi-span systems allow for unlimited widths. Our experienced engineers can provide flexibility in solving industrial needs through design and use of mezzanines, customized loading docks, and a variety of door systems. Whatever your company's requirements are for space, height, width, length or load capacity, a Metal Building system can be designed and manufactured to match them closely and economically. We are proud to serve you and to be an integral part of the American industrial machine. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Somerset, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |