Metal Building for Polk, Pennsylvania Build and Buy Online!
Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. INDUSTRIALAs a company rooted in American heavy industry, We understand and appreciate the importance of strength, dependability and economy in industrial structures. Our Dealers work closely with industrial building users to meet stringent construction schedules, assist with designs for machinery and inventory layouts, and assure the design and the manufacture of strong, stable, low-maintenance structures which enhance the image of their users. Our own in-house team of experienced engineers can also help design crane buildings with a unique combination of strengths and hook clearances to fit individual, industrial requirements and criteria. Clear spans of up to 150 feet wide and heights of up to 60 feet are available, while multi-span systems allow for unlimited widths. Our experienced engineers can provide flexibility in solving industrial needs through design and use of mezzanines, customized loading docks, and a variety of door systems. Whatever your company's requirements are for space, height, width, length or load capacity, a Metal Building system can be designed and manufactured to match them closely and economically. We are proud to serve you and to be an integral part of the American industrial machine. General GuidelinesWhen you decide to buy a Building - Confirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Thank you for visiting Metal Building for Polk, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |