Metal Building for Fountainville, Pennsylvania Build and Buy Online!
Benifits of Steel BuildingsThere are many benefits to building with steel over conventional construction methods. A steel building is probably one of the most economical building choices you can make. Steel buildings have many features not available with many other forms of construction. Steel buildings are typically more economical than conventional methods and can be completed in approximately two-thirds the time required for conventional construction. The appearance of steel buildings can easily be enhanced with many forms of exterior finishes. A suitably insulated metal building can drastically decrease heating and cooling expenses. Insulated roof and wall systems preserve and reassure thermal efficiencies. Extended life materials reduce maintenance, and eliminate troubles such as structural deterioration, rotting and insect damage. Metal Storage BuildingsMetal storage buildings have multiple advantages over wood framed buildings. The upkeep required to maintain wood structures is not an issue with pre engineered steel buildings. Make an investment that will work for you for a lifetime with robust metal storage buildings. A concern with any building is its ability to maintain an acceptable appearance over years. Wooden buildings need repainting and resealing. Metal buildings, rust resistant, and require far less maintenance than conventional structures. Wooden buildings are susceptible to rotting, insects and leaking. If you are storing equipment, livestock or anything of value, these elements are harmful to a conventional structure. Save yourself time and anguish by investing in metal storage buildings with a steel framework and a heavy insulation package. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Thank you for visiting Metal Building for Fountainville, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |