Metal Building for Emigsville, Pennsylvania Build and Buy Online!
Frame TypesUnlike any of our competitors, we allow you to price all building frame types. Select from Clear-span or Modular rigid-frame buildings. We allow you the full flexibility to choose Gable, Single Sloped or Offset Peak building shape. By far, we offer the widest selection of building and frame types. For options not available through the online system, you will need to request a special quote. Clear-span Frames - A clear-span rigid frame offers strength and economy. Since no interior supports are necessary, this design is best when you require large areas of clear and uninterrupted space. Factories, warehouses and agricultural buildings are just a few building types that may utilize a clear-span frame building. A clear-span design does have size limitations. As the desired width increases, the frames will become larger and heavier to carry greater loads across the length of the frame. At some point the cost will outweigh the benefit. Even so, clear-span buildings are still effective for buildings as wide as 150' feet and wider in some cases. Modular Frames - Modular frames use interior columns to evenly distribute the load; reducing the cost of both the frame and foundation of extra wide buildings. The economical advantages become obvious when a building width is about 100' wide or wider. As a result, almost all buildings 100' wide or wider have interior support columns. Modular designs are often used for large factories and warehouses. Single Slope Frames - Single slope frames have high and low eave heights creating a roof that "slopes" from side to side. To select a single slope design, you specify one eave height and define the roof pitch. Single slope designs are frequently used for strip shopping centers, offices, and RV/Boat storage facilities. Just about every steel building has at least one framed opening. It is not unusual for buildings to have several openings. Most openings are created for an overhead door, but can be used for the installation of glass fronts or other entries. Most other online sellers offer "field located" framed openings, which require cutting and fabricating on the job site. Metal Building Depot always provides factory-located openings unless your project requires something otherwise. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Concealed CondensationConcealed condensation is the most difficult to deal with and can be the most damaging to any kind of structure. This type of condensation may be controlled in metal buildings by the proper ventilation. Additional condensation control can be accomplished by venting the cold cavities of the walls and roof. Benefits Of Pre Fabricated Metal BuildingsReasons people choose one thing in place of another are normally are obvious and easy to recognize. Choosing the right kind of steel building system can be a little more difficult. All pre-fabricated metal buildings are not created equal. There are many elements of design and customization that make them very different and the differences are not always obvious. Please brows our preferred vendor listings. There you can find in-depth information about many quality-building suppliers. Regardless of your intended purpose, whether to store equipment or use as a metal shop building, pre fabricated steel structures offer many advantages. Insulation and temperature control options and extras like customized paneling and many color choices add uniqueness and style. The main advantage of a pre fabricated metal building is its simple assembly. Steel Buildings are shipped complete with all the accessories and hardware needed for construction. In many cases, you could have a steel building delivered and erected before most conventional builders could complete the initial planning. To learn more about the benefits of pre fabricated metal buildings, contact a manufacturer. Along with a price quote, they can give you an idea of the customization options and floor plan styles available. Top companies provide the advice of skilled professionals to assess your needs to match you with the right building. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Emigsville, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |