Metal Building for Distant, Pennsylvania Build and Buy Online!
Jamb Cover TrimOne of the trim options we offer is jamb cover trim. Though common, the red-iron jamb and header around a door opening are normally exposed. Using jamb cover trim is an inexpensive way to improve the appearance of your steel building. Jamb Cover TrimOne of the trim options we offer is jamb cover trim. Though common, the red-iron jamb and header around a door opening are normally exposed. Using jamb cover trim is an inexpensive way to improve the appearance of your steel building. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Thank you for visiting Metal Building for Distant, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |