Metal Building for Bowmansdale, Pennsylvania Build and Buy Online!
Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Constructing a Large Steel BuildingHave you considered all of your steel building options? There are many types of standard buildings to choose from, but they are not the only option. Buildings can be finished with a multitude of options and accessories. Your land and location will control some of the parameters of the kind of structure you need. Aside from these factors you can make the choices based on your preferences. Windows, skylights and panel styles can be individually selected to comprise a personal metal building kit. Pre-engineered metal building plans are just the starting point from which you can select options and accessories. Configuring your building may sound like a small deal, but it determines the type building you will purchase. Not every large steel building is intended to be a large shop. When you work with the manufacturer you can customize a structure with a polished look and feel. Regard your steel metal building as a low cost alternative to traditional construction. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Thank you for visiting Metal Building for Bowmansdale, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |