Metal Building for Albrightsville, Pennsylvania Build and Buy Online!
Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Steel Buildings vs. Conventional ConstructionA great advantage of pre-engineered buildings is that they can be relocated if required. Since your building is shipped to you with a complete set of instructions, detailed engineering drawings and a shipping list, you can erect you steel building without consulting a construction company. This also means that should you someday decide to relocate, you can take down your building and erect it elsewhere. Adding partition walls in a steel building allows one building to be a meeting room, or office and storage facility and another to be a restaurant. Building with steel gives you the ultimate in design flexibility. You can either own one outright or purchase a steel building to rent to others. Your one time cost is regained sooner rather than later when you rent it as mini storage or public meeting space. Steel buildings can be designed with a almost unlimited amount of options. If you have a need for a new building, don't make a decision until you have explored your options with a qualified steel building manufacturer. The Steel Building Network has reviewed a wide range of manufacturers, suppliers and building industry professionals, and we know that no matter what your intended use, there is steel building system to suit your needs. Getting I contact with the right company to get your questions answered is the first step in having your building needs met. Insulating Against Radiant Heat Traditional forms of mass insulation, like fiberglass, are effective in preventing heat transfer by conduction and convection, but they less effect on radiant heat. Between 80 and 90% of the radiant heat striking fiberglass will pass through or be "emitted". Radiant transfer typically has as much impact on the temperature in a building as conduction and convection. For more information on radiant barrier facings click here. Thank you for visiting Metal Building for Albrightsville, Pennsylvania. We provide the best service and prices when shopping for metal buildings or steel buildings. |