Metal Building for Hereford, Oregon Build and Buy Online!
Steel Storage BuildingsSome people might not fully appreciate their need for a steel storage building. Think about all the prized possessions, and family heirlooms you are storing in the garage or attic - or even worse - paying high storage fees. There is a far more economical way to store all of your possessions. Whether you are looking to build a storage building for commercial or business use or a simple steel storage building for personal use - you cannot make a wiser choice than with a steel building system. The sturdy metal frame system makes steel storage buildings structurally superior. Pre-engineered steel buildings offer reliable protection to your investments. As with all products, not every manufacturer utilizes high quality materials. Look for a company that explains its materials and its use. Be sure to ask questions about steel storage buildings before you buy, any manufacturer will be happy to address any concerns. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Steel Building PackagesSteel building kits are shipped with all the required hardware to construct a solid structure. Forget about running around town looking for bolts or brackets with steel building packages. When investigating steel building packages, request information about the different options that are available from each steel building manufacturer. Panel material or galvalume colors can complement any building and help to exceed your expectations. You can begin with more standard steel building packages and adjust them suit your specific needs. Working with veteran professionals is the best way to build your new steel building. Completing the steps that help you decide on different configurations for your pre-engineered building insures your ultimate satisfaction. Each part of the design process should be explained and offered for your approval. Steel building manufacturers should be acquainted with commonly asked questions and should be able to anticipate your concerns. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Hereford, Oregon. We provide the best service and prices when shopping for metal buildings or steel buildings. |