Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Metal BuildingsMaybe you have already purchased a small backyard storage unit. If so, you have more than likely discovered that it offers inadequate space. A custom designed metal building can still easily fit in your backyard and provide you with the space you need. Steel buildings can be designed to your specifications; these buildings are complement to your home. Youngsters appreciate the extra space to play, practice, or hang out with their friends. If you are in need of extra space but can't afford pricey construction work, a pre-engineered metal building is the way to go. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Canby, Oregon. We provide the best service and prices when shopping for metal buildings or steel buildings. |