Metal Building for Wainwright, Oklahoma Build and Buy Online!
Ceiling & Wall Liners29g low rib panel applied to the interior of the building providing a clean protective covering over insulation or girt/purlin cavity. Pre Engineered Metal BuildingsDeciding to use a pre-engineered metal building is a wise choice. But, there is important information you will need to provide to the manufacturer in order to have your new steel building to be designed to precise specifications. Understanding your building needs and restrictions can help when you consult with a steel building manufacturer. A few questions you need to ask yourself once you decide to buy a metal building system. What are my size limitations? What will the building be used for? What special building requirements are needed? Why the answers to these questions are so critical is that they expose precisely what kind of pre-engineered building system will satisfy your needs. Metal church buildings have very different structural demands than those of mini storage buildings. If investing money into a pre engineered metal building system it only makes sense to research all options. Perplexed about where to start? Contact a manufacturer; they will ask you the right questions to get what information they need to suitably determine your building needs. They can also help you review your requirements to equip your structure with the appropriate interior and exterior features. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. On The FarmI don't know of any farm operation that could get buy without barns for equipment storage, feed storage or any other general warehousing needs. Many older farms are now removing old wooden structures and replacing their old buildings with new steel structures. While the old antique tractor may look good in front of the old barn, many are weary of storing precious items in an old rotten structure. Steel is stronger, straighter and will last eons longer than wood. In a home, wood is fine. Houses are designed so that the wooden structural components do not have direct exposure to the elements, but on the farm it is often hard to prevent the outside from coming into the barn. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thank you for visiting Metal Building for Wainwright, Oklahoma. We provide the best service and prices when shopping for metal buildings or steel buildings. |