Metal Building for Stillwater, Oklahoma Build and Buy Online!
Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Trim and GutterThe trim on a steel building serves two essential functions, to close transitions and protect the building from the weather. Trim also adds to the appearance of a building. Our sculptured trim gives the building a refined, quality appearance. Trim covers corner and edge areas of a building. For instance, eave trim creates a transition from the roof to the sidewalls and roof to endwalls. Most metal building companies often supply "box" or generic trim pieces. This trim routinely has to be modified to fit, as it is created as multi-purpose - and does not fit well on standard panels. We fabricate each profile to match the design of your steel building. We do a lot of work in the shop that will save you headaches in the field. We hem all exposed edges of our trim so it installs easily, fits neatly, and looks great for the life of your building. Our trim is easy to install and adds to the look and the integrity of the building. Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Stillwater, Oklahoma. We provide the best service and prices when shopping for metal buildings or steel buildings. |