Metal Building for Fairview, Oklahoma Build and Buy Online!
Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Storage Building PlansNo architect or engineer is required to read steel building plans. Although they are technical, they are created so anyone can easily comprehend them. When your steel building package arrives, you will find a wealth of useful information and instructions on building installation. Storage building plans for steel storage buildings show common construction details. The floor plan is displayed so you know what, and in which order to do each task. If you have any difficulties, your steel building manufacturer can easily explain the process. Another important thing you should remember is, since you are an integral part of the building design phase, you should be very familiar with the basic floor plan. But, if you need assistance with building plans, your supplier should explain the layout in a manner more complimentary to your way of thinking. Thank you for visiting Metal Building for Fairview, Oklahoma. We provide the best service and prices when shopping for metal buildings or steel buildings. |