Metal Building for Winchester, Ohio Build and Buy Online!
Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Gutters & DownspoutsThese are generally not required on steel buildings. However, use of these components often enhances the appearance of a building, control drip, splash and drainage. Gutters and downspouts are an optional accessory that serves as trim. Gutters dramatically improve the appearance of buildings, and we recommend them for most building applications. Downspouts control the water falling from the roof, preventing the water from splashing up on the sides of the building. On every Metal Building Depot building, die-formed ridge caps are used to cover the peak opening in the center ridge of the building. Some sellers provide a ridge roll cover that must be sealed with closures. Installing ridge roll trim is not an easy task. Over time the exposed foam closures deteriorate and there can be potential leak problems. Our die-formed ridge caps match the panel profile perfectly and are formed to fit the pitch of the roof. Die-formed ridge caps create an almost seamless transition across the roof. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Temperature ControlYour geographic area will, to a great extent, influence the type of insulation that will provide the best performance. If you live in a mild climate and your building is used for farm equipment storage, insulation may not be necessary. If you are planning to have employees working in a building, you should probably install insulation, particularly in areas where temperatures are extreme. Energy savings will quickly pay for insulation if the building will be climate controlled. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Winchester, Ohio. We provide the best service and prices when shopping for metal buildings or steel buildings. |