Metal Building for Ray, Ohio Build and Buy Online!
Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Temperature ControlYour geographic area will, to a great extent, influence the type of insulation that will provide the best performance. If you live in a mild climate and your building is used for farm equipment storage, insulation may not be necessary. If you are planning to have employees working in a building, you should probably install insulation, particularly in areas where temperatures are extreme. Energy savings will quickly pay for insulation if the building will be climate controlled. Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Commercial BuildingsIt is said that close to 90% of all new commercial construction is a steel building system. The ease of construction makes a new steel building system more attractive to builders and owners alike. From carwashes to skyscrapers steel has, and will continue to lead the way. Steel buildings are great for workshops or manufacturing facilities, classrooms or church buildings, metal buildings are fast replacing less adaptable building systems. Today, more than ever our world is growing faster and more competitive. Architects and professional building designers are becoming more aware of the benefits of steel from a construction and economical standpoint. As new steel building systems are introduced, we see the bottom line improving on construction projects of all kinds. The ease of construction and versatility makes a steel building attractive for a variety of uses. Thank you for visiting Metal Building for Ray, Ohio. We provide the best service and prices when shopping for metal buildings or steel buildings. |