Metal Building for Portland, Ohio Build and Buy Online!
Overall Heat Transmission Coefficient (U-Value) A unit used to express heat passage through a complete building section, including air films. U-Values serve as a basis for determining transmitted heat loss. The lower the U-Value, the higher the insulation value. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Metal Building Depot Sky LightThe Metal Building Depot sky light is an economical method of allowing natural lighting into your building. Sky Lights are commonly used for wall applications in lieu of roof. The sky lights are field installed with self-drilling screws and 3/8" grommet seal fasteners (field drilling required). The sky lights are available in 5'-0" and 10'-0" nominal lengths as a standard. The panel at the end of any wall with sky lights will be a full height metal panel for better corner trim attachment. Steel Building PackagesSteel building kits are shipped with all the required hardware to construct a solid structure. Forget about running around town looking for bolts or brackets with steel building packages. When investigating steel building packages, request information about the different options that are available from each steel building manufacturer. Panel material or galvalume colors can complement any building and help to exceed your expectations. You can begin with more standard steel building packages and adjust them suit your specific needs. Working with veteran professionals is the best way to build your new steel building. Completing the steps that help you decide on different configurations for your pre-engineered building insures your ultimate satisfaction. Each part of the design process should be explained and offered for your approval. Steel building manufacturers should be acquainted with commonly asked questions and should be able to anticipate your concerns. Thank you for visiting Metal Building for Portland, Ohio. We provide the best service and prices when shopping for metal buildings or steel buildings. |