Metal Building for Wake Forest, North Carolina Build and Buy Online!
Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. Insulating Against Radiant Heat Traditional forms of mass insulation, like fiberglass, are effective in preventing heat transfer by conduction and convection, but they less effect on radiant heat. Between 80 and 90% of the radiant heat striking fiberglass will pass through or be "emitted". Radiant transfer typically has as much impact on the temperature in a building as conduction and convection. For more information on radiant barrier facings click here. Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Wake Forest, North Carolina. We provide the best service and prices when shopping for metal buildings or steel buildings. |