Metal Building for Rose Hill, North Carolina Build and Buy Online!
Steel FrameMetal buildings are strong. It is the nature of their design. Because they are built to survive the harshest conditions, you can rest assured that you investment will last for years to come. The basic design provides great structural stability, even in an earthquake or windstorm. The rigid steel frame reinforces the secondary structural framing system. Any building is only as good as its foundation. A steel frame is the ultimate starting point for your building. The last thing you need to worry about is the structural integrity of your office, shop or storage buildings. An advantage with pre-engineered buildings is there are no roof shingles for you to worry about replacing later. A smart investment is one that requires the least amount of cost now and in the future. Steel frame buildings are just such an investment. If you have questions about steel frame buildings, just turn to an expert. There are many qualified steel building manufacturers to answer any question that you may have. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Constructing a Large Steel BuildingHave you considered all of your steel building options? There are many types of standard buildings to choose from, but they are not the only option. Buildings can be finished with a multitude of options and accessories. Your land and location will control some of the parameters of the kind of structure you need. Aside from these factors you can make the choices based on your preferences. Windows, skylights and panel styles can be individually selected to comprise a personal metal building kit. Pre-engineered metal building plans are just the starting point from which you can select options and accessories. Configuring your building may sound like a small deal, but it determines the type building you will purchase. Not every large steel building is intended to be a large shop. When you work with the manufacturer you can customize a structure with a polished look and feel. Regard your steel metal building as a low cost alternative to traditional construction. ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. Other Metal Building DetailsFasteners: Self-drilling fasteners are designed for rapid drilling without slipping of the drill point, thus reducing walking and surface marring. The neoprene washer keeps your building watertight as well as providing vibration dampening. Structural Bolts: We provide all the nuts and bolts to assemble your building through pre-punched holes. Closure Strips: Our Steel Buildings come with closure strips which when installed provide weather tightness. The closure strips are pre-formed to match the profile of the panels. Ridge Cap: The ridge cap is designed to match the slope and contour of the roof providing a tight seal along the ridge of the building. Trim, Flashing, Gutters & Downspouts: All our buildings come with standard trim to give the building a finished clean look. Optional Gutters and Downspouts provide additional protection from the elements. Plans and Drawings: We provide a full set of anchor bolt plans for the placement of anchor bolts in the foundation. We also provide engineered stamped and certified construction prints. In addition we provide an in depth erection manual to walk you through the erection of your building. Thank you for visiting Metal Building for Rose Hill, North Carolina. We provide the best service and prices when shopping for metal buildings or steel buildings. |