Metal Building for Mount Gilead, North Carolina Build and Buy Online!
Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Concealed CondensationConcealed condensation is the most difficult to deal with and can be the most damaging to any kind of structure. This type of condensation may be controlled in metal buildings by the proper ventilation. Additional condensation control can be accomplished by venting the cold cavities of the walls and roof. Thank you for visiting Metal Building for Mount Gilead, North Carolina. We provide the best service and prices when shopping for metal buildings or steel buildings. |