Metal Building for Yorkshire, New York Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Storage Building PlansNo architect or engineer is required to read steel building plans. Although they are technical, they are created so anyone can easily comprehend them. When your steel building package arrives, you will find a wealth of useful information and instructions on building installation. Storage building plans for steel storage buildings show common construction details. The floor plan is displayed so you know what, and in which order to do each task. If you have any difficulties, your steel building manufacturer can easily explain the process. Another important thing you should remember is, since you are an integral part of the building design phase, you should be very familiar with the basic floor plan. But, if you need assistance with building plans, your supplier should explain the layout in a manner more complimentary to your way of thinking. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Thank you for visiting Metal Building for Yorkshire, New York. We provide the best service and prices when shopping for metal buildings or steel buildings. |