Metal Building for Seneca Falls, New York Build and Buy Online!
Metal Building Depot Sky LightThe Metal Building Depot sky light is an economical method of allowing natural lighting into your building. Sky Lights are commonly used for wall applications in lieu of roof. The sky lights are field installed with self-drilling screws and 3/8" grommet seal fasteners (field drilling required). The sky lights are available in 5'-0" and 10'-0" nominal lengths as a standard. The panel at the end of any wall with sky lights will be a full height metal panel for better corner trim attachment. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Steel FrameMetal buildings are strong. It is the nature of their design. Because they are built to survive the harshest conditions, you can rest assured that you investment will last for years to come. The basic design provides great structural stability, even in an earthquake or windstorm. The rigid steel frame reinforces the secondary structural framing system. Any building is only as good as its foundation. A steel frame is the ultimate starting point for your building. The last thing you need to worry about is the structural integrity of your office, shop or storage buildings. An advantage with pre-engineered buildings is there are no roof shingles for you to worry about replacing later. A smart investment is one that requires the least amount of cost now and in the future. Steel frame buildings are just such an investment. If you have questions about steel frame buildings, just turn to an expert. There are many qualified steel building manufacturers to answer any question that you may have. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Seneca Falls, New York. We provide the best service and prices when shopping for metal buildings or steel buildings. |