Metal Building for Dale, New York Build and Buy Online!
Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. When you decide to buy a BuildingConfirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Base ConditionEvery metal building has some type of base connection along the building perimeter, allowing the connection of sheeting. This "base condition" determines exactly how the panels connect to the foundation. To prevent water and pests from entering the building at the base, panels extend below the finished floor of the building. Online design and pricing systems allows users to choose from a number of different base options. Standard Base Angle - Our system defaults to a standard base angle condition. This condition consists of a single angle member, attached to both the wall sheets and the slab. Please note that the standard base condition requires that the slab be formed with a 1˝" sheet notch to allow the sheets to extend below the top of the slab. Deluxe Trim - Deluxe base trim is another option for buildings with concrete slab foundations. Deluxe base trim combines base angle and trim into one piece, providing all the benefits of base trim and base angle. Deluxe base trim is only available in burnished slate color. Base Girt - The base girt option is designed for buildings that sit on piers rather than a full slab. A base girt system does not rest on or attach to the foundation. The base girt attaches to clips on the columns about 6" above the foundation. The base girt provides a great connection for liner panel. Base Channel - The Base channel is a "cee" shaped section that runs the perimeter of the building connected to the floor. It is most commonly used when a liner panel, or interior wall, is going to be installed. The "cee" section provides a pre-positioned connection point for inside panels. This approach requires a sheet notch in the slab (for an alternative, see the combination of base channel and base trim below). Facings as Vapor BarriersThe main function of facings is to act as a vapor barrier. While a vapor barrier may not necessarily be able to stop the flow of water vapor, it does an excellent job of minimizing the rate and volume of the flow. This prevents moisture from accumulating within the insulation blanket and the structure, which translates into consistent thermal values and lower heating and cooling costs. Facings intended to serve as vapor barriers should be installed on the inner, heated surface of the insulation, where vapor pressure is the highest. This helps in preventing vapor from reaching the cooler air and condensing. VAPOR BARRIERS PREVENT VAPOR FROM REACHING COOLER AIR AND CONDENSING. Thank you for visiting Metal Building for Dale, New York. We provide the best service and prices when shopping for metal buildings or steel buildings. |