Metal Building for Ballston Spa, New York Build and Buy Online!
Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Steel Buildings vs. Conventional ConstructionA great advantage of pre-engineered buildings is that they can be relocated if required. Since your building is shipped to you with a complete set of instructions, detailed engineering drawings and a shipping list, you can erect you steel building without consulting a construction company. This also means that should you someday decide to relocate, you can take down your building and erect it elsewhere. Adding partition walls in a steel building allows one building to be a meeting room, or office and storage facility and another to be a restaurant. Building with steel gives you the ultimate in design flexibility. You can either own one outright or purchase a steel building to rent to others. Your one time cost is regained sooner rather than later when you rent it as mini storage or public meeting space. Steel buildings can be designed with a almost unlimited amount of options. If you have a need for a new building, don't make a decision until you have explored your options with a qualified steel building manufacturer. The Steel Building Network has reviewed a wide range of manufacturers, suppliers and building industry professionals, and we know that no matter what your intended use, there is steel building system to suit your needs. Getting I contact with the right company to get your questions answered is the first step in having your building needs met. Components/AccessoriesWhich base trim option should I choose? - The base trim that you choose for your steel building will depend on your building's needs and the type of foundation you use. Although we strongly recommend a notched base, we do offer several additional base trim options to suit your specific needs. Please see base conditions for more helpful information and illustrations. What type of windows do you offer? - We offer a selection of windows for your building. To learn more about what's available please visit the accessories section of our website. What comes with the doors and windows? - All of our doors and windows come with the required hardware to install them into your steel building. We provide the framing, trim, and flashing for a proper installation. How do I know where to place my windows and doors? - Windows and walk doors are generally "field located." You, as the customer, will pick the location, cut the corresponding panel to size and proceed to mount the doors and windows. If you choose to include a large number of windows or doors we may ask you to give us your proposed location to ensure proper building bracing. How do I attach my doors and windows? - All of our walk doors are self-framing, so they include the necessary items to mount them on your building. Our windows are secured by screwing the window trim directly into the building. This is also known as self-flashing. If you live in a high wind area, please talk to one of our design consultants about additional door and window mounting options. What is the R-Value of your insulation? - The r-value of our insulation depends on the thickness you choose. It will vary between R-10 and R-19. Please see the r-value section of our website for more helpful information. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thank you for visiting Metal Building for Ballston Spa, New York. We provide the best service and prices when shopping for metal buildings or steel buildings. |