Metal Building for Vaughn, New Mexico Build and Buy Online!
Metal Building Depot Sky LightThe Metal Building Depot sky light is an economical method of allowing natural lighting into your building. Sky Lights are commonly used for wall applications in lieu of roof. The sky lights are field installed with self-drilling screws and 3/8" grommet seal fasteners (field drilling required). The sky lights are available in 5'-0" and 10'-0" nominal lengths as a standard. The panel at the end of any wall with sky lights will be a full height metal panel for better corner trim attachment. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Vaughn, New Mexico. We provide the best service and prices when shopping for metal buildings or steel buildings. |