Metal Building for Newton, New Jersey Build and Buy Online!
Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. Roof PitchThe angle of a steel building's roof is determined by roof pitch. Roof pitch indicates the rise vertically for every 12 inches of travel horizontally. Our online system allows you to choose up to a 6:12 pitch. There are many considerations with both higher and lower roof pitches. Higher pitched roofs may add to the cost of the building, but can add performance to a building in a heavy snow region. Additionally, you can take advantage of extra space above. High-pitched roofs are less likely to leak and can add style to your building. Low-pitched roofs require less material and therefore cost less. Also it is easier to heat and cool a building with a low-pitched roof. One major advantage of a low-pitched roof is expandability. If you ever add-on to your building you will be able to add more space while keeping the loss of headroom to a minimum. Components/AccessoriesWhich base trim option should I choose? - The base trim that you choose for your steel building will depend on your building's needs and the type of foundation you use. Although we strongly recommend a notched base, we do offer several additional base trim options to suit your specific needs. Please see base conditions for more helpful information and illustrations. What type of windows do you offer? - We offer a selection of windows for your building. To learn more about what's available please visit the accessories section of our website. What comes with the doors and windows? - All of our doors and windows come with the required hardware to install them into your steel building. We provide the framing, trim, and flashing for a proper installation. How do I know where to place my windows and doors? - Windows and walk doors are generally "field located." You, as the customer, will pick the location, cut the corresponding panel to size and proceed to mount the doors and windows. If you choose to include a large number of windows or doors we may ask you to give us your proposed location to ensure proper building bracing. How do I attach my doors and windows? - All of our walk doors are self-framing, so they include the necessary items to mount them on your building. Our windows are secured by screwing the window trim directly into the building. This is also known as self-flashing. If you live in a high wind area, please talk to one of our design consultants about additional door and window mounting options. What is the R-Value of your insulation? - The r-value of our insulation depends on the thickness you choose. It will vary between R-10 and R-19. Please see the r-value section of our website for more helpful information. Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. Thank you for visiting Metal Building for Newton, New Jersey. We provide the best service and prices when shopping for metal buildings or steel buildings. |