Metal Building for Toston, Montana Build and Buy Online!
Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. FacingsIn addition to acting as a decorative protection barrier, facings serve an integral part of the overall insulation system. Facings provide vapor barriers, light reflectivity and structural strength. In some cases, a reinforcement of fiberglass scrim is used for extra rigidity and greater impact resistance. The effectiveness of a vapor barrier depends on three primary factors: 1) Location within the insulated section 2) Permeance 3) Proper installation Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Constructing a Large Steel BuildingHave you considered all of your steel building options? There are many types of standard buildings to choose from, but they are not the only option. Buildings can be finished with a multitude of options and accessories. Your land and location will control some of the parameters of the kind of structure you need. Aside from these factors you can make the choices based on your preferences. Windows, skylights and panel styles can be individually selected to comprise a personal metal building kit. Pre-engineered metal building plans are just the starting point from which you can select options and accessories. Configuring your building may sound like a small deal, but it determines the type building you will purchase. Not every large steel building is intended to be a large shop. When you work with the manufacturer you can customize a structure with a polished look and feel. Regard your steel metal building as a low cost alternative to traditional construction. Visible CondensationTo effectively control visible condensation, it is necessary to reduce the cold surface areas where condensation may occur. It is also important to minimize the air moisture content within a building through the use of properly designed ventilating systems. Thank you for visiting Metal Building for Toston, Montana. We provide the best service and prices when shopping for metal buildings or steel buildings. |