Metal Building for Mound City, Missouri Build and Buy Online!
Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Temperature ControlYour geographic area will, to a great extent, influence the type of insulation that will provide the best performance. If you live in a mild climate and your building is used for farm equipment storage, insulation may not be necessary. If you are planning to have employees working in a building, you should probably install insulation, particularly in areas where temperatures are extreme. Energy savings will quickly pay for insulation if the building will be climate controlled. Thank you for visiting Metal Building for Mound City, Missouri. We provide the best service and prices when shopping for metal buildings or steel buildings. |