Metal Building for Gray Summit, Missouri Build and Buy Online!
Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Thank you for visiting Metal Building for Gray Summit, Missouri. We provide the best service and prices when shopping for metal buildings or steel buildings. |