Metal Building for Dora, Missouri Build and Buy Online!
Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Metal Church BuildingsChurches often grow quickly and are unable to successfully provide service to the people in the community. Metal church buildings are a great way to address emerging parishioners and a need for space. You can easily and affordably created the space needed for your growing church with a new metal building system When looking for an answer to crowding troubles, the answer is certain to arrive. If smiling faces outnumber the seats in your church, then a metal church building is a great solution. The benefits of a pre-fabricated metal building include practicality and economical construction costs. Many customary churches find themselves in need of supplementary space for children's, youth or family activities. A metal church building is an excellent choice to solve your space problems. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Gutters & DownspoutsThese are generally not required on steel buildings. However, use of these components often enhances the appearance of a building, control drip, splash and drainage. Gutters and downspouts are an optional accessory that serves as trim. Gutters dramatically improve the appearance of buildings, and we recommend them for most building applications. Downspouts control the water falling from the roof, preventing the water from splashing up on the sides of the building. On every Metal Building Depot building, die-formed ridge caps are used to cover the peak opening in the center ridge of the building. Some sellers provide a ridge roll cover that must be sealed with closures. Installing ridge roll trim is not an easy task. Over time the exposed foam closures deteriorate and there can be potential leak problems. Our die-formed ridge caps match the panel profile perfectly and are formed to fit the pitch of the roof. Die-formed ridge caps create an almost seamless transition across the roof. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Thank you for visiting Metal Building for Dora, Missouri. We provide the best service and prices when shopping for metal buildings or steel buildings. |