Metal Building for Worthington, Minnesota Build and Buy Online!
Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Facings as Vapor BarriersThe main function of facings is to act as a vapor barrier. While a vapor barrier may not necessarily be able to stop the flow of water vapor, it does an excellent job of minimizing the rate and volume of the flow. This prevents moisture from accumulating within the insulation blanket and the structure, which translates into consistent thermal values and lower heating and cooling costs. Facings intended to serve as vapor barriers should be installed on the inner, heated surface of the insulation, where vapor pressure is the highest. This helps in preventing vapor from reaching the cooler air and condensing. VAPOR BARRIERS PREVENT VAPOR FROM REACHING COOLER AIR AND CONDENSING. Metal Building KitPurchasing your new metal building kit. You should be cautious when buying a metal building kit. Not every manufacturer uses high quality materials or fabricates to the latest industry standards. You don't want to purchase a building from a manufacturer (or broker) whose building parts were produced in a factory without the benefit of a skilled eye to oversee the process. A pre-engineered metal building should come with a complete and comprehensive set of blueprints. When a qualified steel building manufacturer puts its seal of approval on your building design you can rest assured of its structural integrity. You can expect detailed documentation about the building's fabrication and its specific code requirements as well. Before you purchase a metal building kit you should attempt to create a basic plan for its end use and design. Working with a professional steel building company should ensure that all facets of your building are taken into consideration. They can explain the building options and codes in detail so you have the accurate building specifications. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Thank you for visiting Metal Building for Worthington, Minnesota. We provide the best service and prices when shopping for metal buildings or steel buildings. |