Metal Building for Makinen, Minnesota Build and Buy Online!
ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thermal Conductivity (K-Value)A unit used to express the amount of heat, in BTU's per hour, that passes through one square foot of homogeneous material that is exactly one inch thick and has a temperature difference of one degree Fahrenheit between its surfaces. As the K-Value decreases, so does the amount of heat permitted to pass through the material. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Steel Frame ConstructionYou can feel confident about building with steel. It is not vulnerable to the elements to the same degree that other building materials are. There are a few reasons why steel frame construction stands out more than other building materials. Wood has always been a standby, but its susceptibility to weather and aging make it less than ideal. Steel frame construction is very sound should there be a detrimental natural occurrence such as an earthquake or severe storm. You steel building should be manufactured to meet all local and applicable codes. Steel frame construction is a serious way to address the risk posed to you and your belongings should a weather emergency arise. Reputable steel building manufacturers only ship pre-engineered steel building systems when standards and codes are met. It is hard to look past the options and design flexibility that you get with metal and steel buildings. It is not just quality materials that are impressive, but the many accents that can turn a metal building into a beautiful landmark. If you are suffering from lack of space or simply looking for any kind of expansion, check out the range of high quality steel buildings that just might solve your dilemma. Thank you for visiting Metal Building for Makinen, Minnesota. We provide the best service and prices when shopping for metal buildings or steel buildings. |