Metal Building for Holland, Michigan Build and Buy Online!
Roof PitchThe angle of a steel building's roof is determined by roof pitch. Roof pitch indicates the rise vertically for every 12 inches of travel horizontally. Our online system allows you to choose up to a 6:12 pitch. There are many considerations with both higher and lower roof pitches. Higher pitched roofs may add to the cost of the building, but can add performance to a building in a heavy snow region. Additionally, you can take advantage of extra space above. High-pitched roofs are less likely to leak and can add style to your building. Low-pitched roofs require less material and therefore cost less. Also it is easier to heat and cool a building with a low-pitched roof. One major advantage of a low-pitched roof is expandability. If you ever add-on to your building you will be able to add more space while keeping the loss of headroom to a minimum. Metal BuildingsMaybe you have already purchased a small backyard storage unit. If so, you have more than likely discovered that it offers inadequate space. A custom designed metal building can still easily fit in your backyard and provide you with the space you need. Steel buildings can be designed to your specifications; these buildings are complement to your home. Youngsters appreciate the extra space to play, practice, or hang out with their friends. If you are in need of extra space but can't afford pricey construction work, a pre-engineered metal building is the way to go. Benifits of Steel BuildingsThere are many benefits to building with steel over conventional construction methods. A steel building is probably one of the most economical building choices you can make. Steel buildings have many features not available with many other forms of construction. Steel buildings are typically more economical than conventional methods and can be completed in approximately two-thirds the time required for conventional construction. The appearance of steel buildings can easily be enhanced with many forms of exterior finishes. A suitably insulated metal building can drastically decrease heating and cooling expenses. Insulated roof and wall systems preserve and reassure thermal efficiencies. Extended life materials reduce maintenance, and eliminate troubles such as structural deterioration, rotting and insect damage. Building Permits/CodesDo I need a building permit to build my metal building? - You will almost always need a building permit. On occasion you will not need a permit to build but you should ALWAYS check with your local building inspector before purchasing a metal building. When I call my building inspector what should I tell them? - When you get in touch with your building inspector let him know what you're planning and you should be able to receive the information you'll need to get a building permit for your new metal building. What do I do if I need permit drawings? - We supply the permit drawings to you after you have committed to buy a metal building from us. We will not begin fabrication or shipment until you have completed the approval process. See the Approval Process section of our website. What about building codes and loads? - Every metal building that we ship is engineered to comply with regional building codes, wind load and snow load requirements (as stated on your plans). When you start designing your metal building, make sure to review your building code specifications very closely. Since there can be varying requirements within regions - you will need to confirm the codes by contacting your local building official. MetalBuildingDepot.Com is not responsible for confirming codes. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Thank you for visiting Metal Building for Holland, Michigan. We provide the best service and prices when shopping for metal buildings or steel buildings. |