Metal Building for Fremont, Michigan Build and Buy Online!
Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. SheetingAll sheeting is 26-gauge "R" panel. Color sheeting has a galvanized substrate to prevent rust and corrosion. All our Galvalume roof sheeting is hot dipped with a zinc and Aluminum compound to give it the strength to stand up to the worst weather, and the durability to last for generations. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Metal Buildings for RetailEvery retailer knows the importance of the manner in which merchandise is housed and displayed. In the highly competitive arena of retail sales, appearance can make a tremendous impact on attracting customers and influencing purchasing decisions. Your retail facility can be enhanced with decorative brick, wood, stucco, glass, aggregate panels, landscaping and signage. A Metal Building Depot Acceptance Corporation dealer can help you with efficient designs and a more delightful appearance, yet stay within your budget. Strip malls throughout the nation are being built with steel, utilizing the ability to add on or incorporate other fascia items - representing savings of up to 30% over other conventional construction methods. Owners and developers have come to realize that the pace at which a steel building system can be designed, manufactured, delivered and completed, is measurably less than that of any type of conventional construction. The short completion time and overall durability of steel building systems assure a more efficient turnkey project, as well as a quick return on the initial investment. Thank you for visiting Metal Building for Fremont, Michigan. We provide the best service and prices when shopping for metal buildings or steel buildings. |