Metal Building for Swansea, Massachusetts Build and Buy Online!
Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Pre Engineered BuildingsWhen you contract a builder or architect to plan your new building, you are paying a premium for the design. This is costly procedure considering the similarity of building needs. Why pay design fees for a building similar to hundreds already built? Pre engineered buildings can be customized for your exact needs. Buildings are shipped to you pre cut into easily constructed pieces for easy erection. Pre-engineered buildings have become more popular in recent years due to the rising costs of traditional construction services. What is surprising about pre engineered building systems is the structural stability. Buildings are designed to meet wind, snow and seismic loads. Pre-engineered steel buildings offer outstanding performance, quality and resiliency. Metal FrameWhat is a stronger material than metal? Metal frame buildings are nearly indestructible. You can certainly feel safe in even the worst weather in a metal frame structure. Erecting a metal frame pre engineered building might sound like a difficult project, but despite this perception, it is really not the case. Metal frame structures are cut to precise measurements and a complete set of building plans will aid in the assembly process. If you need help constructing your metal building, you will incur additional expenses, so be sure to factor construction cost into your budget when purchasing a steel building. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Thank you for visiting Metal Building for Swansea, Massachusetts. We provide the best service and prices when shopping for metal buildings or steel buildings. |