Metal Building for Granby, Massachusetts Build and Buy Online!
Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Steel Buildings vs. Conventional ConstructionA great advantage of pre-engineered buildings is that they can be relocated if required. Since your building is shipped to you with a complete set of instructions, detailed engineering drawings and a shipping list, you can erect you steel building without consulting a construction company. This also means that should you someday decide to relocate, you can take down your building and erect it elsewhere. Adding partition walls in a steel building allows one building to be a meeting room, or office and storage facility and another to be a restaurant. Building with steel gives you the ultimate in design flexibility. You can either own one outright or purchase a steel building to rent to others. Your one time cost is regained sooner rather than later when you rent it as mini storage or public meeting space. Steel buildings can be designed with a almost unlimited amount of options. If you have a need for a new building, don't make a decision until you have explored your options with a qualified steel building manufacturer. The Steel Building Network has reviewed a wide range of manufacturers, suppliers and building industry professionals, and we know that no matter what your intended use, there is steel building system to suit your needs. Getting I contact with the right company to get your questions answered is the first step in having your building needs met. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Granby, Massachusetts. We provide the best service and prices when shopping for metal buildings or steel buildings. |